Description of the investment: "Borynia" is a coking coal mine constituting part of the JSW SA Group. The mine deposit occupies a mining area of 17.4 km2 and its exploitable resources zasoby operatywne are estimated to amount to 34 million tons of steam, fiery and coking coal. On request of JSW, INTROL built a gas-powered [...] Więcej →
Description of the investment: Zaklad Energetyki Cieplnej (ZEC - Heat Generating Plant) SA in Katowice is a provider of thermal energy in the Upper Silesia area. The Heat Generating Plant is comprised of 10 divisions, the total power of which amounts to ca. 660MW. Within the contract conducted with ZEC SA in Katowice, INTROL performed [...] Więcej →
Description of the investment: The Ziemowit Coal Mine is a part of Kompania Węglowa SA. During the expansion of the coal mine, it turned out to be necessary to build a new pumping station 650 below the ground level. It was a priority investment due to the fact the it was necessary to continuously dewater [...] Więcej →
Description of the investment: The Borynia Coal Mine is one of several companies belonging to JSW SA. Due to the fact that it was necessary to adapt the methane degassing station to accommodate an increased amount of methane and adapt its parameters to current demand, INTROL performed a modernization of the station in accordance with [...] Więcej →
Description of the investment: The Budryk Coal Mine is one of several companies belonging to JSW SA. During the expansion of the mine and upon commencement of excavation of new coal beds, it turned out that it was necessary to build a mine water main pumping station 1050m below the ground level. Scope of work: [...] Więcej →
Description of the investment: The Jankowice Coal Mine is one of several companies belonging to Kompania Węglowa S.A. During the expansion of the mine and upon commencement of excavation of new coal beds, it turned out that it was necessary to build a mine water main pumping station 1050m below the ground level. Scope of [...] Więcej →
Description of the investment: WZK Victoria SA asked a company from the INTROL GROUP to construct the first stage of a new power trestle bridge. The investment is performed within the confines of construction of a new coke battery. Scope of work: • preparation of the detailed design of the new trestle bridge (including geological [...] Więcej →